Power quality is how closely voltage and current match their expected characteristics. Power converters, drives, rectifiers and arc furnaces inject disturbances that can affect the site’s own equipment and that of neighbours on the same network.

Updated on

Common disturbances

  • Harmonics: currents at multiples of grid frequency from non-linear loads, causing heating and tripping.
  • Fast fluctuations (flicker): abrupt load changes, typical of furnaces and rolling mills.
  • Voltage dips and interruptions: the first cause of automated process stops.
  • Phase unbalance and degraded power factor.

Standards and measurement

EN 50160 defines the characteristics of voltage supplied on public networks. The IEC 61000 series covers electromagnetic compatibility, and IEC 61000-4-30 sets class A measurement methods. IEEE 519 is often used as a reference for harmonic emission limits at the connection point. A two-to-four-week measurement campaign covering normal and degraded operation establishes the baseline.

Solutions

Power quality becomes an architecture criterion as soon as you plan process electrification and electrolysers. Early dialogue with the grid operator and monitoring within smart grids avoid connection refusals and penalties.

  • Passive filters: economical for targeted harmonics.
  • Active filters and STATCOM: dynamically correct harmonics, unbalance and reactive power.
  • Active front-end converters: cut harmonics at source, for instance with SiC components.
  • Storage: a battery can support voltage during dips, see energy storage.

Example diagnosis

A site sees random drive trips. The measurement campaign shows voltage dips caused by a large motor starting on the same busbar. The fix combines a soft starter, adjusted dip ride-through on drives and a separate feeder for sensitive circuits, cheaper than an active filter across the whole site.

Responsibilities

The site is responsible for the disturbances it injects at the connection point, and the grid operator for the voltage quality it supplies. Contracts and connection studies define limits for each party. Keep measurement records as evidence in case of dispute, and review them whenever you add large converters or motors.