Process electrification: replacing fuel with electricity

Electrification means supplying thermal uses, previously met by gas, oil or coal, with electricity. It is the most direct decarbonisation route for process heat up to about 200 °C, and it is advancing beyond that with electric furnaces.

Updated on

Technologies by temperature level

  • Up to 150 °C: industrial heat pumps and mechanical vapour recompression, with efficiencies far above resistance heating.
  • Electric boilers: electrode or resistance types, efficiency close to 99 %, very responsive, relevant to absorb abundant renewable power.
  • Induction, arc, infrared and microwave furnaces: direct heating of parts, no flue gas, high precision.
  • Above 400 °C: electric furnaces and, for some uses, low-carbon hydrogen.

Constraints to anticipate

  • Connection capacity: replacing a boiler house of several tens of MW requires grid reinforcement, with lead times that can exceed several years.
  • Price ratio between electricity and gas, plus taxes and levies.
  • Power quality: harmonics and fluctuations, see power quality.
  • Continuity of service: plan a backup or top-up source.

Decision method

Map heat demand by temperature level, reduce it first through recovery and intensification, then electrify in order of profitability. Thermal storage and the flexibility described in smart grids lower the cost of electricity consumed. Include the carbon price in your decarbonisation pathway and test several energy price scenarios over ten to fifteen years.

Example sequencing

A food plant can first recover condenser heat, install a heat pump for 80 °C preheating, then add an electric boiler for peaks while keeping the gas boiler as backup. Stepwise deployment limits exposure to energy prices, validates real performance and lets you negotiate the connection progressively.

Indicators to track

Follow delivered heat cost per MWh, seasonal efficiency of each electric asset, share of electricity from low-carbon sources, peak power drawn and hours of flexible operation. These indicators show whether the project delivers its business case and feed the site’s energy management system and carbon reporting.