Investing in the transition: leaning on public policy

Decarbonisation and energy-efficiency projects need large investments, which subsidies, taxation and regulation can make profitable. The challenge is to understand the landscape of schemes and factor it into risk assessment.

Updated on

Schemes to know

  • Carbon pricing: EU ETS allowances and the CBAM raise the cost of emissions.
  • Energy savings certificates: in France, premiums for many standard or specific operations.
  • Decarbonisation aid: national calls for projects, France 2030 and regional support for industrial processes.
  • European funds: the Innovation Fund and schemes tied to the Clean Industrial Deal, with an adapted state-aid framework.

Assessing the project rigorously

A subsidy does not make a bad project good. Base the decision on discounted cash flows and on energy and carbon price scenarios, following EN 17463. Include often-forgotten costs: connection, maintenance, production stops, decommissioning. Eligibility conditions (incentive effect, cumulation of aid, filing before commitment) change regularly: check them before signing any order.

Building the application

For a specific technology, the pages on industrial heat pumps, storage and hydrogen give the technical references to attach to the application.

  • Support the file with an energy audit and real measurements.
  • Quantify gains in energy, CO₂ and competitiveness.
  • Combine several funding sources, checking cumulation rules.
  • Tie the project to the company’s decarbonisation pathway.
  • Prepare acceptability with the local area.

Anticipating change

The aid landscape moves fast: budgets, criteria and timetables change from year to year. Appoint someone to monitor it, meet regional agencies and trade federations regularly, and keep a portfolio of technically studied projects ready to file when calls open.

Risk management of funding

Aid can be withdrawn, delayed or capped. Build the business case so that the project remains acceptable at reduced subsidy levels, keep documentation ready for audits, and verify compliance conditions during the whole holding period, to avoid repayment obligations after commissioning.

Key takeaway: treat public support as a lever, not a foundation. Projects that remain viable under conservative assumptions are the ones that deliver durable gains once schemes evolve.